    • 19:00 → 19:20
      BTOF design 20m
    • 19:20 → 19:40
      testbeam plan (December) 20m

      We have reserved beam time from 9:00 a.m. on December 11 to 9:00 a.m. on December 19.

      Our main beam-test period for the ePIC AC-LGAD will be from 9:00 a.m. on December 17 to 9:00 a.m. on December 19. We will share the telescope with the following groups:

      MOSAIX: December 11, 9:00 a.m. – December 14, 9:00 a.m.
      SPARC: December 14, 9:00 a.m. – December 17, 9:00 a.m.
      ePIC AC-LGAD: December 17, 9:00 a.m. – December 19, 9:00 a.m.
      Before our main slot, the telescope will be commissioned and operated by the MOSAIX and SPARC groups. During this period, we will be able to test the AC-LGAD, FCFDv1.2, and MCP-PMT as a standalone system. This should give us sufficient time to commission each component before integrating it with the telescope.

    • 19:40 → 20:00
      March 2027 TOF workshop 20m

      March 3-5, 2027 at UCSC
      https://indico.bnl.gov/event/35270/