Conveners briefly update with news, comments and new directions from the Steering Committee (if any).
simulation runs with dRICH with the biggest possible setup.
mRICH is there, has photons, some modules removed.
DIRC is not the real DIRC, but stands for material, no photons, just pure quartz bars.
does it have the inner radius matching the actual one?
that might be the reason why mRICH boxes are removed (up to 90 cm)
currently DIRC inner radius is 95 cm in simulation.
some 7 cm have been added between ECAL and DIRC for future upgrades (?)
Updates from the main efforts with details about the progress in the activity. Please, be short and prepare a few (maximum three) slides focusing on what has been achieved since the last meeting.
Advice on design, simulation, performance issues
Simulation & performance studies
simulation & performance studies, design, cost estimate etc.
R&D on SiPM as an option for the readout of the forward RICH
R&D on LAPPD detectors must not be forgotten
This is time devoted to a longer discussion with a presentation of work done or to be done, if there is any and if there is the need for that.
In case there is any other business to discuss, we can take it here. If discussion takes longer than 5 minutes, it means that it needs a proper space and will be point for next week.