MVTX Weekly Electronics Meeting

US/Eastern
Joachim Schambach (Oak Ridge National Laboratory), Ming Liu (Los Alamos), Yasser Corrales Morales (LANL)
Description

Join ZoomGov Meeting
https://bnl.zoomgov.com/j/1603202671?pwd=Qng1QjhyWVV0YTA0VXV3dzNOWHQyUT09

Meeting ID: 160 320 2671
Passcode: 394064
One tap mobile
+16692545252,,1603202671#,,,,*394064# US (San Jose)
+16468287666,,1603202671#,,,,*394064# US (New York)

Dial by your location
        +1 669 254 5252 US (San Jose)
        +1 646 828 7666 US (New York)
        +1 669 216 1590 US (San Jose)
        +1 551 285 1373 US
Meeting ID: 160 320 2671
Passcode: 394064
Find your local number: https://bnl.zoomgov.com/u/aybnfoZQO

Join by SIP
1603202671@sip.zoomgov.com

Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)

Meeting ID: 160 320 2671
Passcode: 394064

    • 13:30 13:50
      Commissioning 20m

      Plans for LBNL half-detector tests before shipment to BNL
      Plans for BNL surface commissioning and repairs
      QA software for Half Detector test/ Commissioning

      Speakers: Cameron Dean (LANL), Zhaozhong Shi (Los Alamos National Laboratory), Ming Liu (Los Alamos), Yuan Mei (LBNL), Yasser Corrales Morales (LANL), Joachim Schambach (Oak Ridge National Laboratory)

      FELIX Testing

      • Currently testing board 4 of 8
        • Running iBERT now
      • Takes < 3h per test
        • Includes shutdown and removal of the previous board, initial flashes, and reboots
      • We see consistent failures when testing the FELIX buffer
        • I got in contact with test developers at CERN and they requested more information
      • We also see an error about the SMBus
        • "ERROR: No riser card SMBus found!"
      • Could finish tests tomorrow (or Monday morning)
      • Results are all uploaded here https://bnlbox.sdcc.bnl.gov/index.php/f/26168545

      Stave Testing

      • Began testing MVTX staves yesterday
        • Currently on stave 4 of 9
        • Aim to finish tests tomorrow (or Monday morning)
      • All staves tested are still silver and results mostly match LBL test results
        • One stave had a test go from silver to gold at BNL (Digital scan BB, 0V, -10%)
    • 13:50 14:00
      Cable, Racks, Crates, Power System 10m
      • cables, racks, crates updates
      • power system (CAEN) updates
      • power board, breakout board updates
      • fanout board updates
      • fiber routing
      Speakers: Ho San Ko, Ming Liu (Los Alamos), Cameron Dean (LANL), Joachim Schambach (Oak Ridge National Laboratory), Yuan Mei (LBNL)
      • 5 long detector cables (2E1 to PP3) arrived @ LBL
        • Expect 5 more to be sent to LBL
        • Trying to speed up the manufacturing process
      • Start the epoxy application to the PCB and Fischer connectors for the short detector cables (PP3-PP2)
        • applying epoxy so that we can put a strain relief without constraints
        • Can apply the epoxy to ~ 5 cables at a time for curing
      • Power cables for 2E3-2E1 produced
      • Still needs
        • PT100, CANBUS, RB (from 2E3 to 2E1), Sense
    • 14:00 14:10
      Slow Controls & Detector Safety System 10m

      Detector Safety System
      ALF, ITSCommLayer progress
      WinCC
      Cooling interface

      Speakers: Michael Peters (Massachusetts Inst. of Technology (US)), Yasser Corrales Morales (LANL), Joachim Schambach (Oak Ridge National Laboratory)
    • 14:10 14:30
      Readout, Trigger, DAQ 20m

      VTRx issues
      RU Firmware
      FELIX Firmware
      GTM
      Readout Software
      Continuous/Triggered Readout Scheme
      GBTx1 problem
      AMD server

      Speakers: Yasser Corrales Morales (LANL), Joachim Schambach (Oak Ridge National Laboratory), Ming Liu (Los Alamos)
    • 14:30 14:40
      AOB 10m