The meeting will address
- status of mechanical design
- status of electronics, i.e FEBs and how they get connected to the chambers any requirements where the ROBs need to sit, how far can we drive the signal
- service needs, cables (signal, LV, HV and cooling)- gas system
- big topic how to integrate the MPGD in the detector especially the ones sitting at smaller radii