PID Review Final Talks
Wednesday 5 July 2023 -
07:00
Monday 3 July 2023
Tuesday 4 July 2023
Wednesday 5 July 2023
07:20
Executive Session
-
Rolf Ent
(
Jefferson Lab
)
Executive Session
Rolf Ent
(
Jefferson Lab
)
07:20 - 07:40
07:40
Welcome & Introduction
-
E. C. Aschenauer
(
BNL
)
Rolf Ent
(
Jefferson Lab
)
Welcome & Introduction
E. C. Aschenauer
(
BNL
)
Rolf Ent
(
Jefferson Lab
)
07:40 - 08:00
08:05
Particle Identification Systems Overview and Requirements
-
Benedikt Zihlmann
(
employee@jlab.org;member@jlab.org
)
Particle Identification Systems Overview and Requirements
Benedikt Zihlmann
(
employee@jlab.org;member@jlab.org
)
08:05 - 08:25
08:25
Detector Integration Status and CAD Design
-
Alex Eslinger
(
employee@jlab.org;member@jlab.org
)
Detector Integration Status and CAD Design
Alex Eslinger
(
employee@jlab.org;member@jlab.org
)
08:25 - 08:45
08:45
Flow of Requirements, Interfaces and system engineering
-
Walt Akers
(
Thomas Jefferson National Accelerator Facility`
)
Flow of Requirements, Interfaces and system engineering
Walt Akers
(
Thomas Jefferson National Accelerator Facility`
)
08:45 - 09:00
09:00
Break
Break
09:00 - 09:10
09:10
Backward Region: proximity-focusing RICH
-
Alexander Kiselev
(
BNL
)
Backward Region: proximity-focusing RICH
Alexander Kiselev
(
BNL
)
09:10 - 09:40
Each detector talk addressees: requirements (see eic.jlab.org), interfaces, tech. Details, status of R&D w.r.t. milestones and current project R&D plans, open points, plans for construction, 1 slide on ES&H/QA plans and hazards, current simulation performance vs. requirements, organizational structure of work packages for sub-systems and schedule/timeline w.r.t. P6. Include reference to charge that is addressed in each slide and in the outline.
09:40
Barrel Region: high-performance DIRC
-
Grzegorz Kalicy
(
CUA
)
Barrel Region: high-performance DIRC
Grzegorz Kalicy
(
CUA
)
09:40 - 10:10
Each detector talk addressees: requirements (see eic.jlab.org), interfaces, tech. Details, status of R&D w.r.t. milestones and current project R&D plans, open points, plans for construction, 1 slide on ES&H/QA plans and hazards, current simulation performance vs. requirements, organizational structure of work packages for sub-systems and schedule/timeline w.r.t. P6. Include reference to charge that is addressed in each slide and in the outline.
10:10
Forward Region: dual RICH
-
Marco Contalbrigo
(
INFN Ferrara
)
Forward Region: dual RICH
Marco Contalbrigo
(
INFN Ferrara
)
10:10 - 10:40
Each detector talk addressees: requirements (see eic.jlab.org), interfaces, tech. Details, status of R&D w.r.t. milestones and current project R&D plans, open points, plans for construction, 1 slide on ES&H/QA plans and hazards, current simulation performance vs. requirements, organizational structure of work packages for sub-systems and schedule/timeline w.r.t. P6. Include reference to charge that is addressed in each slide and in the outline.
10:40
Break
Break
10:40 - 10:50
10:50
Barrel and Forward TOF: AC-LGAD
-
Zhenyu Ye
(
University of Illinois at Chicago
)
Barrel and Forward TOF: AC-LGAD
Zhenyu Ye
(
University of Illinois at Chicago
)
10:50 - 11:10
Each detector talk addressees: requirements (see eic.jlab.org), interfaces, tech. Details, status of R&D w.r.t. milestones and current project R&D plans, open points, plans for construction, 1 slide on ES&H/QA plans and hazards, current simulation performance vs. requirements, organizational structure of work packages for sub-systems and schedule/timeline w.r.t. P6. Include reference to charge that is addressed in each slide and in the outline.
11:10
AC-LGAD readout systems
-
Tonko Ljubicic
(
BNL
)
Dominique MARCHAND
(
employee@cnrs.fr
)
AC-LGAD readout systems
Tonko Ljubicic
(
BNL
)
Dominique MARCHAND
(
employee@cnrs.fr
)
11:10 - 11:25
requirements of ASCI, milestones and current project R&D plans and expected future work
11:25
Readout and Sensors Status SiPMs
-
Marco Contalbrigo
(
INFN Ferrara
)
Roberto Preghenella
(
INFN Bologna
)
Readout and Sensors Status SiPMs
Marco Contalbrigo
(
INFN Ferrara
)
Roberto Preghenella
(
INFN Bologna
)
11:25 - 11:40
requirements for sensor, operation and readout, technical solutions, milestones and current project R&D plans and expected future work
11:40
Readout and Sensors Status LAPPD/HRPPD
-
Alexander Kiselev
(
BNL
)
Readout and Sensors Status LAPPD/HRPPD
Alexander Kiselev
(
BNL
)
11:40 - 11:55
requirements for sensor, operation and readout, technical solutions, milestones and current project R&D plans and expected future work
11:55
DAQ streaming readout Overview
-
David Abbott
(
Jefferson Lab
)
DAQ streaming readout Overview
David Abbott
(
Jefferson Lab
)
11:55 - 12:10