https://brookhavenlab.sharepoint.com/:x:/s/EICPublicSharingDocs/EdH38QZE9HpJrl039jn2-q4BbPvrMv7dTFiLV8--atclKw?rtime=VzGC0wy-3Eg
In the spreadsheet: I wrote "288 RDO with FPGA and Fibre links, mounted near the end of BTOF from both sides at z=+/-120cm (TBD)"
There is no explicit mention about locations of cooling manifolds but we did indicate in the spreadsheet 144x2 Al cooling pipes between cooling manifolds and detector, and 4x2 Stainless steel cooling tubes between cooling manifold and cooling system. The factor of 2 could be interpreted as two sides
A slide I presented at the TIC meeting on 5/22/2023 also clearly indicated TOF services are from both sides. This was the time when the project asked the detector subsystems to provide inputs for integration, and the TIC meeting on 5/22 was specifically to discuss the PID integration status.