ePIC AC-LGAD TOF DSC Weekly Meeting Wednesday (10:30AM)

US/Eastern
https://zoom.us/j/94203887542?pwd=NERaQWRuaEdlQ0JaOFRiSm1DT09QUT09 (zoom link)

https://zoom.us/j/94203887542?pwd=NERaQWRuaEdlQ0JaOFRiSm1DT09QUT09

zoom link

Meeting ID: 942 0388 7542 Passcode: 467095
Zhangbu Xu (Kent State University), Satoshi Yano
Description

eic-projdet-tofpid-l@lists.bnl.gov

    • 10:30 10:50
      news and updates 20m
      Speaker: Zhangbu Xu (Kent State University)
    • 10:50 11:10
      pre-TDR PID TOF layers (how do we approach this?) 20m

      8.3.4.1 The time-of-flight layers
      Requirements
      Requirements from physics: Add text here.
      Requirements from Radiation Hardness: Add text here.
      Requirements from Data Rates: Add text here.
      Justification
      Device concept and technological choice:

      Subsystem description:
      General device description: Add text here.
      Sensors: Add text here.
      FEE: Add text here.
      Other components: Add text here.
      Performance

      Implementation
      Services: Add text here.
      Subsystem mechanics and integration: Add text here.
      Calibration, alignment and monitoring: Add text here.
      Status and remaining design effort:
      R&D effort: Add text here.
      E&D status and outlook: Add text here.
      Other activity needed for the design completion: Add text here.
      Status of maturity of the subsystem: Add text here.
      Environmental, Safety and Health (ES&H) aspects
      and Quality Assessment (QA planning: Add text here.
      Construction and assembly planning: Add text here.
      Collaborators and their role, resources and workforce: Add text here.
      Risks and mitigation strategy: Add text here.
      Additional Material Add text here.

    • 11:10 11:30
      DAC meeting August 28-29 20m

      https://indico.bnl.gov/event/24086/

    • 11:30 11:50
      fibers and connectors needed for VTRx+ electronics 20m

      Dear Zhangbu, Satoshi and Wei,

      We got request from Fernando to provide information on requirement of fiber lengths. Attached is the spreadsheet where the column “Qty” shows the # off vtrx+ needed . List of fiber length choices along with detailed notes are included in the file. Basically one need to specify the max and minimum length of fiber based on the reference in the file and also the # of such fibers. The requested last date of submitting this requirement and finalizing it is end of November 2024.

      Best regards,
      Sourav