TOF Coordinator Meeting
Thursday 5 September 2024 -
11:00
Monday 2 September 2024
Tuesday 3 September 2024
Wednesday 4 September 2024
Thursday 5 September 2024
11:00
double-sided BTOF assembly
double-sided BTOF assembly
11:00 - 11:20
Room: https://cern.zoom.us/j/4745455693?pwd=em8ybklNZ2VTTTdXWXcvZjNIclErZz09
https://indico.bnl.gov/event/20727/contributions/93749/attachments/56159/96118/2024_07_26_TOF_MECH_FLEX.pdf Simone requested a decision on this to move on with the prototype design, if there is any issue or concern, please let us know. simulation and detector geometry implementation also requires this to be decided. This will be the default design as we move on toward the future BTOF design
11:20
pre-TDR document and assignments
-
Zhangbu Xu
(
Kent State University
)
pre-TDR document and assignments
Zhangbu Xu
(
Kent State University
)
11:20 - 11:40
Room: https://cern.zoom.us/j/4745455693?pwd=em8ybklNZ2VTTTdXWXcvZjNIclErZz09
What is the length of each chapter? 8.3.4.1 The time-of-flight layers Requirements Requirements from physics: Add text here. (Xu, Yano) Requirements from Radiation Hardness: Add text here. (Simone) Requirements from Data Rates: Add text here. (Tonko) Justification Device concept and technological choice: Subsystem description: General device description: Add text here. (Zhenyu?) Sensors: Add text here. (Simone, Satoshi) FEE (FEE+modules): Add text here. (Wei, Tonko, Simone, Prithwish) Other components: (PS, cooling) Add text here. (Frank, Oskar) Performance (Kentaro, Prithwish, Tommy) Implementation Services: Add text here. (Frank, Wei, Zhangbu) Subsystem mechanics and integration: Add text here. (Andy, Yang) Calibration, alignment and monitoring: Add text here.(Satoshi, Zhangbu) Status and remaining design effort: R&D effort: Add text here. (Alex, Simone, Wei, Tonko) E&D status and outlook: Add text here. (Andy, Simone, Yi, Satoshi) Other activity needed for the design completion: Add text here. (Satoshi, Zhangbu) Status of maturity of the subsystem: Add text here. (Satoshi, Zhangbu) Environmental, Safety and Health (ES&H) aspects and Quality Assessment (QA planning: Add text here. (Simone, Wei, Mathieu) Construction and assembly planning: Add text here. (Simone, Satoshi, Wei, Tonko) Collaborators and their role, resources and workforce: Add text here. (Satoshi, Zhangbu) Risks and mitigation strategy: Add text here. (Satoshi, Zhangbu) Additional Material Add text here.