ePIC AC-LGAD TOF DSC Weekly Meeting Wednesday (10:30AM)

US/Eastern
https://zoom.us/j/94203887542?pwd=NERaQWRuaEdlQ0JaOFRiSm1DT09QUT09 (zoom link)

https://zoom.us/j/94203887542?pwd=NERaQWRuaEdlQ0JaOFRiSm1DT09QUT09

zoom link

Meeting ID: 942 0388 7542 Passcode: 467095
Zhangbu Xu (Kent State University), Satoshi Yano
Description

eic-projdet-tofpid-l@lists.bnl.gov

    • 10:30 10:50
      PDR report (assignments) 20m

      https://www.overleaf.com/project/66e0603e1fc718e728c9d072

      will add those who would like to edit in the group.
      If your name is missing from the list, please let me and Satoshi know.

      8.3.4.1 The time-of-flight layers

      Requirements
      Requirements from physics: Add text here. (Xu, Yano)
      Requirements from Radiation Hardness: Add text here. (Simone)
      Requirements from Data Rates: Add text here. (Tonko)
      Justification
      Device concept and technological choice:

      Subsystem description:
      General device description: Add text here. (Zhenyu?)
      Sensors: Add text here. (Simone, Satoshi)
      FEE (FEE+modules): Add text here. (Wei, Tonko, Simone, Prithwish)
      Other components: (PS, cooling) Add text here. (Frank, Oskar)

      Performance (Kentaro, Prithwish, Tommy)

      Implementation
      Services: Add text here. (Frank, Wei, Zhangbu)
      Subsystem mechanics and integration: Add text here. (Andy, Yang)
      Calibration, alignment and monitoring: Add text here.(Satoshi, Zhangbu)
      Status and remaining design effort:
      R&D effort: Add text here. (Alex, Simone, Wei, Tonko)
      E&D status and outlook: Add text here. (Andy, Simone, Yi, Satoshi)
      Other activity needed for the design completion: Add text here. (Satoshi, Zhangbu)
      Status of maturity of the subsystem: Add text here. (Satoshi, Zhangbu)
      Environmental, Safety and Health (ES&H) aspects
      and Quality Assessment (QA planning: Add text here. (Simone, Wei, Mathieu)
      Construction and assembly planning: Add text here. (Simone, Satoshi, Wei, Tonko)
      Collaborators and their role, resources and workforce: Add text here. (Satoshi, Zhangbu)
      Risks and mitigation strategy: Add text here. (Satoshi, Zhangbu)
      Additional Material Add text here.

      <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<
      Comments from Silvia:

      Dear John and Silvia:

      The TOF group is discussing how to work on the TDR document.
      We were assigned in the PID section (8.3.4.1).

      We have a few questions on how to proceed:
      Roughly how many pages should we write?
      As it was advertised, the TDR text should be coincise, therefore each
      subsystem
      is expected to use 10-15 pages. Probably, you have more information
      that you would like to
      convey. You can us the "addition material" section. Later, this
      additional material will be organized
      in Appendices. Therefore, the additional material can overcome the
      limitation in
      number of pages which is imposed for the TDR text.

      We will have separate document where our DSC group can write together,
      And then we copy over to the master TDR, is this the procedure we should follow?
      The procedure is up to you. Several subsystems are collecting material in
      their own files and plan to have it transferred to the official overleaf
      version
      before the dead-lines. The first dead-line is for Version0 on September 29.

      For electronics and readout, how much should we write in our section and
      How much would be written in the electronics and DAQ sections?
      The FEE should be discussed in your section, while the whole read-out chain
      is presented in the dedicated section by the electr/r-o/DAQ CC WG conveners.

      ES&H: is there a global ES&H, or do we have to write down ourselves?
      You have to write down those aspects which are specific to your subsystem.

      Best greetings, Silvia

      Thanks!

      Satoshi and Zhangbu

    • 10:50 11:10
      new AC-LGAD chip design 20m
      Speaker: Gabriele Giacomini (BNL)