Satoshi: 

about workfest in July at JLab, 

who are going to be in person? 

We used to organize with Far-Forward groups, 
what is their plan this time? 

I will send an email to Alex asking about this. 

Deadline to ePIC management is Friday. 

Kentaro: 

missing pathleng in the simulation branch 
use BW function to fit the mass distribution. 
Should have used mass^2 instead of mass, 
and maybe use Gaussian? 
Gamma in BW is the FWHM, very different from 
Sigma in Gaussian. 

Simulations of charge sharing and hit resolution have not 
been propagated into the official simulation. This needs to be done.  

DAC review talks: 

final versions? 

Uniform format among talks.
Other than ASIC, TOF appears to be ready for construction at the end of 2026.
radiation dose is from integration of 6 months' run per year over 10 years.
BTOF geometry should use the latest version.

Pixel sensors are available at UIC, 
ship to Simone? 
strip sensors not a lot, one at LBL, 
rest (10 3x1, 1 3x1, 5 3x2) at UCSC 
all testsed with laser 

test beam in Japan, proposed to do test beam by Satoshi 
quite flexible with beam time. September recieving sensors for test 
Tokoku university facility with 800MeV electron beam