ESB/Systems Testing Meeting
November 18, 2025
Attendees: Halen, Akshaya, Bo Gyeong, Norbert, Minho, Shinhyung, Jeonsgsu, Zisis
Agenda
- Announcements, Minutes from Previous Meeting, Action Items
- Reports
- Any other Business
- Action Items
- Next meeting
Minutes
- Announcements, Minutes from Previous Meeting, Action Items:
- Zisis mentioned that the GTLs finished a reduced (“must have to continue work”) budget for Production Phase, as requested by BNL. This resulted in ~40% of the budget being shifted into a second fiscal year.
- A joint Korean-N.American management meeting is planned later in November.
- The ePIC Collaboration meeting has moved from Vancouver to NY. Norbert mentioned that there will be a CALOROC workfest and it will be good to have BIC people there.
- Reports:
- Electronics/FEB:
- Norbert reported that progress is being made in producing a SiPM Board + cable interface for SFILs, which will be sent to ANL to be tested. Next, they will work on a summing board for SFILs and the interface to Aram’s output. After all these tests, the design for the CALOROC production version will commence.
- There is a Readout/DAQ meeting on Thursday November 20 at 9am EST, with updates from Fernando and Norbert, concerning BIC and other detectors.
- It is being considered to add a third chip to CALOROC for 3x36=108 channels, since low voltage power for ETCs and AstroPix will be needed. R&D and test articles are needed.
- Zisis reported that Aram has ordered boards for Baby BCAL that should be delivered in the next two weeks for testing. Tegan is compiling a comprehensive list of measurements for boards, SiPMs, light guides, cookies.
- Mechanics:
- Zisis communicated with Ross Machine Shop and Tom O’Connor to understand the precise locations of the features needed to bolt ESB-1 (PED) onto the Baby BCAL and to define the tolerances on the light guides. Once the latter is defined, we will get an updated quote for 6000 units, and make 50-mm-long LGs to be tested at Regina and KNU.
- Cooling work continues at UManitoba.
- Any other business: None.
- Action Items:
- Everyone:
- Add to ESB SiPM+HGCROC readout ‘notebook’: https://docs.google.com/document/d/1sYigAkFCmJEWc_ibXQEzfHkyYoaF8dK-/edit
- Develop and log beam test plans; we will likely gather this info in another ‘notebook’.
- Next meeting:
- Joint meeting between Systems Testing and ESB & DAQ and will be announced.
There are minutes attached to this event.