High-Bay: Anjaly: spoke to Martin, space is clean, move next week (Martin confirms)
David: LED system: reached out to Steve Boose, Steve will provide preliminary design before he retires; David has lab space at NMSU and is setting up LED lab
Norbert: sending boards to David for LED tests
Oleg: preliminary design review: Week of October 6 : 8am-2pm, one presentation 2nd day (We or Th) around lunch time (just one presentation)
- Template slides? Oleg will make some. No more than 30 minutes
- Design (pretty much finished)
- Cover everything that leads up to calo roc board
- Refurbishment work
- Chimney modifications
- Schedule
- Work planning
- To update basis of estimate
- For November readiness review, in preparation for CD2 in March
- Page-turn on 23rd
- 29th post everything
- Charge by next week
- discussion on background radiation damage (combined for all subsystems, so we won’t have to talk about that), so we talk about performance and how we’ll reach them
- Heat load: (see email). Rough estimate: < 5 kW total
- Engineers want to do a full thermal simulation, also for A/C
David: K-means neural network to fix clustering, asked Derek for pointers to variables