Update to baseline geometry
Monday 29 September 2025 -
09:00
Monday 29 September 2025
09:00
Update on ePIC geometry from engineering team
-
Dan Cacace
(
BNL
)
Update on ePIC geometry from engineering team
Dan Cacace
(
BNL
)
09:00 - 09:20
09:20
Updated 2T and 1.7 T Field Map 10/01/2025
Updated 2T and 1.7 T Field Map 10/01/2025
09:20 - 09:40
Description of 2T the field map format for the different columns 1:X [MM] 2: Y [MM] 3: Z [MM] 4: BX [T] 5: BY [T] 6: BZ [T] 7: B [T] the field map covers +/- 7m along z, +/- 4m in y and +/- 6m in x n 2cm steps
09:40
Update on ePIC Services geometry from ME team
-
Roland Wimmer
Update on ePIC Services geometry from ME team
Roland Wimmer
09:40 - 10:00
The radiation thickness is calculated as an Al equivalent