INTT Weekly meeting

US/Eastern
    • 20:00 20:20
      INTT Plan for the end of AuA run and the commissioning of pp 20m
      Speaker: Akitomo Enokizono (RIKEN)
      [Akitomo:  INTT Plan for the end of Au+A run and the commissioning of pp]
      - One week of C-AD commissioning and one week of sPHENIX commissioning is proposed by PAC meeting.
      - Higher luminosity is higher priority for p+p run than higher polarization.
      - Please give us your thought on what we need for the p+p commissioning
      - Also if you need any special Au+Au run, please let us know.
      -- Maybe a half field run would be useful for the calibration and low-pT particle.
    • 20:20 20:40
      Plots for the INTT barrel NIM 20m

      Plots that I have for the INTT barrel NIM

      Speaker: Cheng-Wei Shih (National Central University)

      [Cheng-Wei: Plots for the INTT barrel NIM]

      - In Slide 3, the right is based of survey, and the left plot is after alignment correction, which is the latest geometry file.
      -- This alignment is based on both field on and filed off data.
      -- The relative alignment to the MVTX is good.
      - Joseph will revisit the alignment especially for the ladder at a strange position.
      -- Is cosmic data useful?
      - To get a narrower residual distribution doesn't necessary mean the geometry parameter is correct.
      - There must be gap in the INTT barrel geometry because the half barrels couldn't be completely closed during installation.