Bi-weekly INTT Meeting
→
US/Eastern
Orange Room (Building 510)
Orange Room
Building 510
Description
To join the Meeting:
https://bluejeans.com/110988407
To join via Browser:
https://bluejeans.com/110988407/browser
To join with Lync:
https://bluejeans.com/110988407/lync
To join via Cisco Jabber Video:
https://bluejeans.com/110988407/jabber
To join via Room System:
Video Conferencing System: bjn.vc -or-199.48.152.152
Meeting ID : 110988407
To join via phone :
1) Dial:
+1.408.740.7256
+1.888.240.2560
+1.408.317.9253
(see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 110988407
================================
Layer-0 optimization <Yorito>
================================
- Conserve the space between FPHX chip and the edge of HDI. This space may not be reduced. (Yorito)
- Fix the reconstruction efficiency to reach 1, not to saturate at 0.9. Visually confirm inefficiency in the simulation. (Yorito)
- Re-evaluate pure geometrical efficiency and absolute occupancy using HIJING. (Yorito)
- To be discussed in sPHENIX tracker meeting about the ladder configuration, not to be discussed z-layer. We stick with old design for CD-1 review to avoid people into confusion.
================================
INTT #of Layer Study <Gaku>
================================
- DCA distribution of MB in slide 5 looks fat than it supposed to be. Clarify. (Gaku)
- Apply p_T>1GeV cut on the reconstructed track level. (Gaku)
- Select only electroncs in simulation (don't worry about realistic PID measurement). (Gaku)
================================
L123 Prototype Schedule update <Itaru>
================================
- Send all pieces for practice assembly by June 1st. (Itaru)
- Arrange graphite sheet order from RBRC. (Itaru)
- Keep updating shipping status to Rachid (itaru)
Layer-0 optimization <Yorito>
================================
- Conserve the space between FPHX chip and the edge of HDI. This space may not be reduced. (Yorito)
- Fix the reconstruction efficiency to reach 1, not to saturate at 0.9. Visually confirm inefficiency in the simulation. (Yorito)
- Re-evaluate pure geometrical efficiency and absolute occupancy using HIJING. (Yorito)
- To be discussed in sPHENIX tracker meeting about the ladder configuration, not to be discussed z-layer. We stick with old design for CD-1 review to avoid people into confusion.
================================
INTT #of Layer Study <Gaku>
================================
- DCA distribution of MB in slide 5 looks fat than it supposed to be. Clarify. (Gaku)
- Apply p_T>1GeV cut on the reconstructed track level. (Gaku)
- Select only electroncs in simulation (don't worry about realistic PID measurement). (Gaku)
================================
L123 Prototype Schedule update <Itaru>
================================
- Send all pieces for practice assembly by June 1st. (Itaru)
- Arrange graphite sheet order from RBRC. (Itaru)
- Keep updating shipping status to Rachid (itaru)