ESB/Systems Testing Meeting
March 24, 2026
Attendees: Junseop Shin, Halen Davies, Jeongsu Bok, Jun Hyung Park, Hyon-Suk Jo, Minho Kim, Shinhyung Kim, Maria Żurek, Bobae Kim, Zisis Papandreou
Agenda
- Announcements
- Beam Test: Summary after the Hall D RC Meeting
- Baby BCAL Boards: Update
- AOB
- Next meeting
Minutes
- Announcements: The BIC beam test team is at JLab.
- Beam Test updates (logistics, communications, training, spaces):
- Maria and Zisis gave short updates on the progress, training, badging, walkthrough requirements. Andrew Lumanog is working on the ePAS and electrical safety. We will inquire with Hall D whether we can crane the Baby BCAL and the support table on the Hall D upstream platform, on Friday. This will allow the rest of the equipment to be installed and comics to be taken over the weekend.
- Daily progress reports start today, at 1pm EDT in L210A at JLab and via zoom.
- Baby BCAL Boards: Update:
- Halen reported that heat flux measurements continue.
- AOB:
- Regina Shipments are still stuck.
- Next meeting: March 31, joint Systems/ESB.
There are minutes attached to this event.
Show them.