Introductions around the table. The whole team is here.

Reports:

  • Norbert, Olaiya, and Akshaya set up an HGCROC with LED. Running calibrations.
    ANL team arrived yesterday night, all equipment in EEL building, we start setting up the SFIL setup

  • RadWorker Training in two groups today. Safety Walk in Hall D tomorrow 10 AM with Mark Dalton

  • Martin Started working on the network. Need to coordinate with the helpdesk.

 

Plan for the afternoon:

  • Set up the SFIL setup with trigger and collect cosmics.

  • Run HGCROC calibrations on the SFIL setup

  • Martin will keep working on the network setup. 

 

There are minutes attached to this event. Show them.
    • 13:00 13:30
      Progress report on beam test 30m

      Reports on all aspects of the tests (mechanical, ScFi, SiPMs, HGCROC, RCDAQ, etc.

      Speakers: Maria Zurek (Argonne National Laboratory), Zisis Papandreou (University of Regina)