EPIC Far-Forward Weekly Meeting

US/Eastern
Description

Wiki: https://wiki.bnl.gov/EPIC/index.php?title=FarForward

Join ZoomGov Meeting
https://bnl.zoomgov.com/j/1602996456?pwd=NHlISDV4bWpDTlZVZjFWNzdkMEtBZz09

----------

Meeting topics:

*preTDR updates (e.g. backgrounds and rates)
*preparations for the NIM A special issue
*testbeam @ SPS
*any other business
 

NIM A article

  • Detector contributions coordinated by detector subsystem collaborations, physics contributions by the physcis working groups.
    • For us, this is the exclusive, diffractive, and tagging working group - https://indico.bnl.gov/event/30775/ (example Indico)
  • Aim is to have contributions "ready" by August.
    • preTDR material + additional technical details, studies, etc. 
  • Each subsystem will have its own chapter.

 

Testbeam

  • July 22nd to 27th -- shared time with ATLAS HGTD, we will not have exclusive use of the telescope (maybe not even at all).
  • EICROC0 firmware fix in progress with IJCLab and Omega - this is needed to make any progress on an EICROC setup for the SPS beam time.
    • Once fixed, need to calibrate ASIC and then setup external DC-LGAD trigger to begin testing.
  • If EICROC is not ready for SPS, we will likely have to cancel the testbeam, as the project will not pay for more beam time for JUST AC-LGADs without a clear, obvious need (pending analysis of recently completely and on-going campaigns).

 

Roman pots/OMD/B0 staves

  • Discussion about needed signal and power lines in PCB stave -- only need the ones relevant to the LPGBT communication, adding the ones for the FPGA readout will make the PCB unnecessarily larger.
    • Electronics meeting on Friday at 11am EST.
  • For the vacuum-based detectors, need to use low outgassing PCBs -- likely Kapton. Need to get cost estimates once we have a design.
    • Not needed for B0, so perhaps we use conventional PCB materials for the B0 to reduce cost.
    • More discussion needed, but we expect to have a preliminary design in the coming 2-4 weeks.

 

ZDC

  • Sebouh and Sean working on the DD4HEP geometry change to match the preTDR.
    • Will look into the reconstruction to ensure things look okay, and address issue from email on March 13th along with Sean.
  • Preliminary comparisons of HEXSPLIT geometry and square tiles shows only marginal decrease in performance for photons, but still within the requirements.
    • Worth the reduction in complexity of the system.

 

Final Comments

  • ZDC preliminary design review is next Monday, April 20th
  • Meeting on Tuesday, April 21st is cancelled due to many of us being in DC

 

 

 

 

There are minutes attached to this event. Show them.
    • 09:00 09:30
      preTDR and NIM A special issue; AC-LGAD testbeam 30m
      Speakers: Alexander Jentsch (Brookhaven National Laboratory), Igor Korover (MIT), Miguel Arratia (University of California, Riverside), Yuji Goto (RIKEN), Yulia Furletova (Jefferson Lab), Zvi Citron (Ben Gurion University of the Negev)