***ATTENTION Indico Users***

Notice: LaTeX services are temporarily disabled and will be reintroduced in 3.3.12 which is currently being planned

Please see the News section for more information.

ePIC AC-LGAD TOF DSC Weekly Meeting

US/Eastern
https://bnl.zoomgov.com/j/1617546118?pwd=qNzxLqF8Q4Mj3RerAZdVSELzEgEQzV.1 (zoom link)

https://bnl.zoomgov.com/j/1617546118?pwd=qNzxLqF8Q4Mj3RerAZdVSELzEgEQzV.1

zoom link

Zhangbu Xu (Kent State University), Satoshi Yano
Description

eic-projdet-tofpid-l@lists.bnl.gov

zoom link : https://bnl.zoomgov.com/j/1617546118?pwd=qNzxLqF8Q4Mj3RerAZdVSELzEgEQzV.1

    • 19:00 19:20
      TOF Preliminary Design Review (June 3-4) 20m

      From: Surabhi Tarafdar stara@jlab.org
      Sent: Wednesday, April 1, 2026 5:14:13 PM (UTC-05:00) Eastern Time (US & Canada)
      Subject: Re: TOF Preliminary Design Review

      Dear TOF DSL and DSTCs,

      The agenda for TOF PDR (60% design completion) has been finalized and will take place on June 3 and June 4 , 2026. The charge questions for the reviewers and the agenda is below

      Charge questions :
      1. Are the technical performance requirements appropriately defined and complete for this stage of the project?
      2. Are the plans for the various sub-systems appropriately documented and complete for this stage of the project?
      3. Are the current plans for the detector likely to achieve the technical performance requirements, with a low risk for cost increases, schedule delays, and technical problems?
      4. Are the schedule assumptions for the fabrication of the various sub-systems and assembly plans reasonable and consistent with the overall detector schedule?
      5. Have ESH&Q and QA considerations been adequately incorporated into the plans at their present stage?
      6. Have the recommendations from previous reviews been adequately addressed?
      Schedule (assigning speakers???)
      June 3, 2026
      08:00 (20 mins) Executive Session (Closed Session)
      08:20 (15+5 mins) Overview and Requirements –
      08:40 (20+10 mins) BTOF sensors -- Yano
      09:10 (30+10 mins) BTOF modules -- Mazza
      09:50 (30+10 mins) BTOF integration -- Jung
      10:30 break
      10:40 (20+10 mins) TOF ASICs --
      11:10 Further questions
      11:30 Adjourn
      June 4, 2026
      08:00 (20+10 mins) FTOF sensors -- Jentsch
      08:30 (30+10 mins) FTOF modules -- Benoit
      09:10 (20+10 mins) FTOF integration -- Benoit
      09:40 (20+10 mins) TOF Service Hybrid -- Wei Li
      10:10 Further Questions
      10:30 break
      10:40 (Short) Executive Session
      11:30 Adjourn
      June xx, 2026
      9:00 (30 mins) Closeout

      Best regards,
      Surabhi

    • 19:20 19:40
      Beam Test at Jlab and DESY and Japan updates? 20m

      KEK possible dates: 6/04, 05/28, 05/21

      NO test beam at FNAL

      Feb 19-25 at KEK, first week of March

      JLab testbeam results:
      https://drive.google.com/file/d/1O-Y1ByGy6GPxHMMKGyODMDPGZAW5nWI4/view
      test beam facilities:
      https://test-beam-facilities.web.cern.ch

      paper out on irradiated AC-LGADs from last year: https://arxiv.org/abs/2503.16658
      We did another round of irradiation with neutrons on some AC-LGADs but at extreme fluence, plus another irradiation campaign with protons on the large AC-LGADs that should be ready soonish.
      SEB studies from BNL: https://indico.global/event/14966/contributions/133281/attachments/63257/122069/SEB_CPAD_2025.pdf

      Cheers,
      Simone