Far-Forward Engineering Meeting
→
US/Eastern
Description
https://bnl.zoomgov.com/j/1658386942?pwd=jfdBW1OFxwIy2RZtW5c7jcQLg87afY.1
----------
Meeting topics:
*Roman pots design discussion
--Impedance calculations (updates, if any)
--vacuum constraints
*Geometry updates
*AOB
Short update on impedance
- Gang showed results at a previous IR meeting - no major red flags with RP configuration he got from Karim.
- Karim will supply Gang with the 275 GeV location for the planes for another simulation.
Geometry updates in DD4HEP
- Alex is still working on adding the current CAD model into DD4HEP and checking the acceptances, et al.
- Goal is to evaluate the acceptances with each subsequent change:
- First update RP layout.
- Next, add additional material into the layers (Copper cooling/RF shielding).
- Then, add outer rim of copper (affects low-pT acceptance, but how much?).
- Update beam pipe and scattering chamber dimensions.
- Add basic flanges and bellows.
Additional aspects of the vacuum system which require further follow-up
- Various transitions between pipe section, bellows, flanges, etc. will all have impact on detectors (how much depends on the item in question) --> this needs to be evaluated in the simulations, as well (Alex).
There are minutes attached to this event.
Show them.