Calibrations and Productions:
- Run 22 pp500 st_physics, st_mtd, st_upc completed done
- ==> st_fwd awaits further progress on FWD software; consider processing a fraction (e.e. 10%) sooner?
- ==> Zero field data (2022+2024) DEV test production completed at request of FWD group
- > > Memory exceeded 4 GB for a single job, and re-running it succeeded
- Runs 20 & 21 7p7 beam-beam and 26p5 FXT : P25iy calibration production ongoing
- ==> Run 20 7p7 beam-beam may need TPC SpaceCharge calibration re-visit; will assess from the calibration production
- ==> event.root produced for 7p7 beam-beam in case needed for TPC dE/dx
- Run 23 AuAu200 needs EPD calibration finished (expected in a week or so)
- ==> Also needs library freeze (SL26y) with memory management patches
Libraries
- SL16d_embed : immediacy of need stressed at last week's Analysis Meeting; I need to tag what I have and discuss vetting it with the parties of interest
- SL26y and SL26a freezing still to-do; await one or two more FWD PRs
- SL20c patch for embedding deuterons still to-do also
Speaker:
Gene Van Buren
(BNL)