Review in December
- Schedule is almost finalized, need to confirm with IJCLab on cooling discussion/presentation.
Discussion about RDO and cable routing
- As discussed in the Roman pots meeting, we really need to look at a dedicated RDO design to meet the B0 constraints.
- For cable routing, Igor pitched an idea for an adapter board which can be used for cable routing to avoid multiple bends in ribbon cables coming from the stave.
- Alex sent Igor/Zvi/Michael/Avishay the current v0 Roman pots module board design to evaluate the needed traces for such an adapter card, among other questions.
- RDO (lpGBT) can support 28 ASICs, but there is a question about rate limits. Rates were calculated by Alex: https://indico.bnl.gov/event/34480/contributions/130196/attachments/72787/124623/FF_backgrounds_and_rates_Jentsch_9_28_2026_v1.pptx
- Need to ensure we know how many ASICs per RDO we can actually support so we can finalize the needed number of RDOs.
- Will follow-up with DAQ and electronics.
CAD model, beam pipes, and support
- Need to have a dedicated meeting to ensure the detector CAD, magnet CAD, and beampipe are all at the latest version so we can evaluate all constraints and ensure there are no conflicts. --> needs to happen ASAP.
- Guna has the latest beam pipe model, Avishay has the detector model.
- Need to fully understand available supports for the detector(s).
Discussion of CD-3C scope
- Aim is to buy ALL SiPMs using CD-3C budget, including for the ancillary detectors.