EPIC Electronics & DAQ WG meeting: Grounding

→ US/Eastern
Description

Join ZoomGov Meeting
https://bnl.zoomgov.com/j/1618397692?pwd=Rm9zMmJxa1NNakpiMmN3K012ZndJUT09

Meeting ID: 161 839 7692
Passcode: 462040
One tap mobile
+16692545252,,1618397692#,,,,*462040# US (San Jose)
+16468287666,,1618397692#,,,,*462040# US (New York)

Dial by your location
        +1 669 254 5252 US (San Jose)
        +1 646 828 7666 US (New York)
        +1 551 285 1373 US
        +1 669 216 1590 US (San Jose)
Meeting ID: 161 839 7692
Passcode: 462040
Find your local number: https://bnl.zoomgov.com/u/alHADfMo1

Join by SIP
1618397692@sip.zoomgov.com

Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 161 839 7692
Passcode: 462040

 

Wiki :

DAQ - EIC Project Detector Collaboration (bnl.gov)

Mailing list :

https://lists.bnl.gov/mailman/listinfo/eic-projdet-daq-l

https://lists.bnl.gov/mailman/admin/eic-projdet-daq-l

eic-projdet-daq-l@lists.bnl.gov 

Mattermost : join det1-daq channel 

  https://eic.cloud.mattermost.com/signup_user_complete/?id=i8gnmob4stdrpjfrezhegxs3ew

 

Project information link

https://wiki.bnl.gov/EPIC/index.php?title=Project_Information

Cables and service spreadsheets subdetectors

 

Passcode: ze^1VNKu

Quick recap

The Electronics and DAQ working group meeting focused on grounding strategies for the ePIC detector system, with Fernando presenting a detailed overview of the proposed grounding plan. He explained the existing facility grounding infrastructure including ground rods around the tunnel perimeter and safety cables connecting to a main grounding pillar in the IP6 area. The discussion centered on two approaches: a distributed grounding model using isolated grounding pads for each sub-detector versus the STAR experiment's method of connecting all large metal structures directly to a common ground system. Gerard raised concerns about potential ground voltage differences and increased noise pickup with the isolated approach, while others noted the benefits of independent control over different detector subsystems. The group agreed that further detailed discussions with individual sub-detector teams would be needed to determine the optimal implementation approach, considering both technical requirements and space constraints.

Next steps

  • Fernando: Talk to Roland and the integration group to set up meetings with sub-detectors to discuss grounding requirements
  • Fernando: Coordinate with integration group to assess space constraints for grounding connections
  • Fernando: Announce upcoming sub-detector meetings so people can join and provide input
  • Team: Research and gather information about grounding approaches from other collider experiments
  • Team: Start with one complete sub-detector model to test grounding approach before applying to others
  • Fernando: Upload grounding presentation slides to Indico for reference
  • Team: Consider both grounding approaches and make decision based on feasibility and noise concerns

Summary

ePIC Grounding Planning Meeting

Fernando led a meeting of the Electronics and DAQ working group focused on grounding in ePIC, highlighting the importance of finalizing electronics and DAQ plans by May 2027 for the FDR schedule. The group discussed upcoming meeting dates, including a break for Thanksgiving and the collaboration meeting from January 11-15. Landgraf mentioned progress from a recent firmware task force meeting and announced that a future December meeting would focus on software between Martin and Nestack. Fernando began presenting on facilities grounding, sharing historical drawings from 1979 that showed existing ground rods and safety wires around the perimeter of the tunnel.

Tunnel Grounding System Design

Fernando explained the grounding system in the tunnel areas, describing exothermic welds connecting ground wires and the use of square boxes designated as equipment areas for accelerator instrumentation and detectors. He outlined the concept of clean ground and power segregation, where clean ground powers detector instrumentation through delta-Y isolation transformers, while facilities ground powers magnet supplies, pumps, and motors. Fernando emphasized the importance of keeping these systems separate to prevent ground mixing, with clean ground systems labeled as E1 and facilities ground as E2.

Magnet Steel Grounding Plan

Fernando confirmed that the magnet steel structure, including the solenoid steel, will be connected to clean ground as discussed in the STAR project. He presented the grounding plan that was previously shared at a collaboration meeting in Rome, outlining the delta Y transformer, ground pillar, and monitoring systems. The plan aims to ensure safety, low noise, signal integrity, and proper earth ground reference through low impedance connections to the ground pillar.

Electrical Grounding Standards Discussion

Fernando discussed electrical grounding standards and requirements for the detector system, emphasizing that no subsystem should inject significant currents into ground and that return paths must have lower impedance than source paths. He explained the importance of separate grounding for each sub-detector to prevent noise interference and outlined plans for grounding pads around the magnet to connect sub-detectors while maintaining separation. Gerard raised concerns about these approaches differing from STAR's previous practices of direct bonding to metal structures, questioning whether this new method was necessary.

Detector Grounding Strategy Discussion

Fernando presented a grounding strategy for detectors where each sub-detector would have isolated grounding pads connected to a bonding plate, with thicker cables leading to ground pillars. The team discussed concerns about isolated versus connected grounding approaches, with gvisser arguing that connecting all detectors together as in the STAR model would provide better EMI protection due to reduced voltage differences between components. The discussion highlighted the trade-off between maintaining control over individual detector interference and minimizing potential EMI pickup through direct connections.

Detector Grounding Implementation Strategy

Fernando discussed the challenges of implementing grounding and structural connections for complex detector systems, noting that the integration group is working on space constraints while each sub-detector needs individual assessment. The team plans to conduct case-by-case meetings with sub-detectors to understand implementation approaches and address technical questions about cable connections, grounding, and structural isolation. Fernando committed to coordinating with Roland and the integration group to schedule these meetings, aiming to complete the grounding strategy by the end of 2027.

Grounding Pad Implementation Discussion

The team discussed grounding pad implementation, with Fernando explaining that the proposed pads would be electrically isolated using a copper block on insulating standoffs, similar to the GlueX model. Gerard raised concerns about potential ground voltage differences between subsystems, referencing his experience with STAR where he measured about 1 volt of noise between different grounded components. Fernando agreed to discuss the grounding approach with Roland and set up additional meetings to explore alternative models, including researching how other collider experiments handle grounding systems.

Detector Grounding Strategy Discussion

The team discussed grounding strategies for detectors, considering two main approaches: a solid grounding scheme similar to STAR or an isolated detector scheme with grounding pads. Fernando agreed to work with the integration group to set up meetings with sub-detector teams in the new year to evaluate space constraints and determine the best approach, potentially starting with a single complex sub-detector as a model. The team acknowledged that while both approaches have trade-offs between visibility and robustness, the final decision depends on mechanical space availability and will be informed by input from sub-detector teams.