Hi all, Here is the meeting minutes. Mainly action items are listed. - Silver epoxy glue mask and flow measurement criteria for the stave (Rachid) o Genki should calculate the volume of the bonding mask and calculate the effective thickness of the silver epoxy glue and finish up his GEANT model update. To be reported in the tracking group meeting if required. o Itaru reflects Rob's newly proposed criteria as the testing item of the production stave in the specification document. - Sensor QA (Kai-Yu) o Although the cause of the double band is not understood, he continues silicon QA with newly invented method-2 which doesn't show double band. - Ladder testing (Cheng-Wei) o Bias on/off slope difference in the calibration invented by Cheng-Wei works to identify the missing wire bonding channel. We also look into direct noise measurement in the test bench which will also tell the missing wire bonding, plus this measurement is necessary to evaluate the ladder performance anyway to record the fake hit rates for all ladders. - Production status and the ladder testing procedure (Itaru) o We agreed to send one of early assembled ladder in Taiwan and BNL to NWU and tested there. o Itaru will investigate the BNL exporting regulation of the ladder. o Itaru will arrange with Rachid to send another bag of FPHX chip to NCU. o Rachid will find out the humidity control of the lab and storage in BNL. o Itaru will check the required humidity/temperature storage conditions of silicons from the manual, otherwise ask HPK. o The noise measurement in test bench will be attempted at NWU. o Wei looks into the feasibility to omit the source test to save time of the redundancy of cosmic ray. -> Conclusion is the rate is too small to use cosmic ray to identify the dead channel in silicon sensor. We will pursue setup for the source test. Let me know if there is any action item I've overlooked. The next meeting is the next week. Regards, -itaru