ATHENA PID weekly regular meeting
Zoom
-
-
1
Weekly news
Conveners briefly update with news, comments and new directions from the Steering Committee (if any).
From the DAQ WG:
Please consider the following questions for each of the detectors that your group proposes to build. This is the template for the detector input to the DAQ discussion at the August 27th convener working group meeting.
https://drive.google.com/drive/folders/1SktoZLYlNlSg2O3PVraLu6-mZ3gzs3jZ
-
Roundtable updates
Updates from the main efforts with details about the progress in the activity. Please, be short and prepare a few (maximum three) slides focusing on what has been achieved since the last meeting.
-
2
DIRC
Advice on design, simulation, performance issues
Speakers: Grzegorz Kalicy (CUA), Joe Schwiening (GSI) -
3
mRICH
Simulation & performance studies
Speaker: Murad Sarsour (Georgia State University) -
4
dRICHSpeakers: Christopher Dilks (Duke University), Evaristo Cisbani (Italian National Institute of Heath and Italian Institute of Nuclear Physics)
- 5
-
6
Low momentum PID with TOFSpeaker: Wenqing Fan
-
7
B field impact on forward RICHSpeakers: Chandradoy Chatterjee (INFN Trieste (IT)), Roberto Preghenella (INFN Bologna)
-
8
DAQ
Gathering DAQ requirements from PID WG
Speaker: Alexandre Camsonne (JLAB) -
9
LGADs for TOF-PID
simulation & performance studies, design, cost estimate etc.
Speakers: Shuai Yang (Rice University), Prof. Wei Li (Rice University) -
10
SiPM for RICH optical readout
R&D on SiPM as an option for the readout of the forward RICH
Speaker: Roberto Preghenella (INFN Bologna) -
11
Pressurised argon for the gaseous RICH
mechanical studies and simulations for a pressurised argon vessel for the forward gas RICH
-
12
LAPPD option for photon readout
R&D on LAPPD detectors must not be forgotten
Speaker: Silvia Dalla Torre (INFN, Trieste) -
13
Barrel eCal with tracking and timing capabilitySpeakers: Maria Zurek (Argonne National Laboratory), Paul E Reimer (Argonne National Laboratory)
-
2
-
Presentations
This is time devoted to a longer discussion with a presentation of work done or to be done, if there is any and if there is the need for that.
-
14
AoB
In case there is any other business to discuss, we can take it here. If discussion takes longer than 5 minutes, it means that it needs a proper space and will be point for next week.
-