Compile document -- Compare and contrast ECCE and Athena designs for FB region
Speakers:
Igor Korover
(MIT),
Jaroslav Adam
(BNL),
Krzysztof Piotrzkowski
(AGH UST),
Nicholas Zachariou
(University of York)
Points to address:
- A summary of the key items/open issues in the consolidation/optimization effort within your WG
- For each non-trivial difference working groups will then work to prepare a pro/con list accounting for technical performance, risk and cost. The resolution of non-trivial differences should be discussed in close consultation with the Global detector/integration WG, physics working groups, the EIC project, relevant detector consortia and R&D efforts.
- What are the resources needed to address these issues? In addition to R&D and simulations, please highlight any additional resources that will be required. Are there missing resources or information the SC should be aware of?
- What are the timescale(s) for resolution? What drives the timescale(s)?
- How are the Physics Working Groups integrated into your detector working group efforts?