sPHENIX Services & VESDA Routing Meeting
→
US/Eastern
Description
Agenda:
The purpose of this meeting is to talk about the design work done on sPHENIX services routing and the on-detector VESDA system and as well what else needs to be done. This is an informal meeting, a space where we can show and tell. We will have a more formal review at some point after 4th of July. Here is the lineup for the meeting:
- On-Detector VESDA Pipe Routing - John
- Water & Gas Single Line Diagram (SLD) - Peter (Me)
- ECW & Off-Detector Water Pipe Routing - Dan Puleo
- On-Detector Water & Gas Pipe Routing - Roland
Contact
Meeting notes:
Water & Gas SLD
- There is a possibility that MVTX will get Dry Air
- MBD is not getting N2
- TPOT does not need N2
- No ODH concerns from N2. Calculations already done. Can pull from files if needed
- Does TPC diffuse laser need N2?
ECW & Off-Detector Water Pipe Routing
- Integrate EMCAL SiPM water pipe routes with ECW pipes & tray
- Change rigid pipes on slide 6 to flex line. Add supports as needed
- Have sections of flex line connect different sections of rigid pipe lines
On-Detector Water & Gas Pipe Routing
- New consolidated gas panel design and locations. 1 panel on the north on L1 near pole-tip door, 1 panel on the south on L1 near pole-tip door
On-Detector VESDA System
- North zone piping run needs to be integrated with new tray that has been installed in the IR
- Need to find & source clamps to secure pipes to gussets between pole-tip doors and cradles
- Need to adjust north & south zone in-field as needed to accommodate EMCAL cooling panels in each corner on L1
- Slide 20 - hole locations need to be determined
There are minutes attached to this event.