PD-4 Approval Review
Monday 12 Dec 2022, 02:30
→
04:00
US/Eastern
02:30
→
04:00
sPHENIX Response to PD-4 Review Recommendations
1h 30m
Speakers
:
Edward O'Brien
(
BNL
)
,
Glenn Young
KPP Demonstration and WBS Dictionary.pptx
Archival Items
1808 sPHENIX AS CD-1 final.pdf
sPHENIX_WBS_Dictionary with PCR-028 Changes August 23 2021.xlsx
SPHX Progress File Full Schedule_November2022 Status.pdf
Hazard Analysis Report
Scope Verification Forms
Scope Verification sPHENIX WBS 1.1 Management signed.pdf
Scope Verification template sPHENIX WBS 1.2 TIme Projection Chamber Signed.docx
Scope Verification template sPHENIX WBS 1.3 EMCal Signed.docx
Scope Verification template sPHENIX WBS 1.4 HCal Signed.docx
Scope Verification template sPHENIX WBS 1.5 Calorimeter Electronics.docx
Scope Verification template sPHENIX WBS 1.6 DAQ_Trigger Signed.docx
Scope Verification template sPHENIX WBS 1.7 Min Bias Trigger Detector Signed.docx
sPHENIX_Final_CloseOut_Report
Transition to Operations Plan