Discussion and preparation of PID presentation for March 4.

US/Eastern
Description

Zoom info


ePIC requested from the DSCs a TDR plan for their subsystem for calendar year 2024, including:

  • The lab/testbeam/prototyping needed;
  • The further progress needed for the reconstruction software;
  • The verification of the implementation of the detector and detector response in simulation and validation using information from lab/testbeam exercises or from literature;
  • The studies required to demonstrate the detector performance;
  • The required engineering design;
  • The needed resources to achieve 60% (CD-2) and 90% (CD-3) design completion;
  • The plan should include the time required to draft the text for the pre-TDR (CD-2) and TDR (CD-3).


The plan should present the activities required month by month in order to allow progress to be monitored. The ultimate goal of this exercise should be 90% design completion consistent with the requirements of the TDR and CD-3, indicatively by the end of 2024.