INTT Weekly meeting
2025年8月14日
20:01
Hit carry-over issue : Ryotaro
+ deadline is approaching
- preGM - Aug. 21
+ long-standing questions are understood!
- fish-bone structure
each bone is produced by the specific BCO-spacing value
- there upper-limit of handling the hits with same BCO spacing.
- slope is ~600 for 1 BCO
- upper-limit is 14000. This limit is based on the FELIX
+ Hit Push-back to the original BCO
-> code is made.
-> Most of the hits can be recovered.
-> Hit-push back is not perfect for the small BCO spacing.
Q: Nhit vs BCO spacing in half ladder analysis has a clear line
Comments
1) good to quantify 6 panel plot, How much improved when each condition is applied
INTT efficiency : Takahiro
+ efficiency is under investigation using the MC (PYTHIA)
- eff is tracking efficiency (acceptance) + hit detection efficiency
+ Q
- dataset: MDC2 with AuAu collision
- track finding: Truthtable
- associated cluster
- What efficiency? Acceptance & hit-detection eff
- clear definition is necessary
- good to discuss it offline what he want to show in his poster
Digital control: Tomoki
- which chips are the digital control setting applied.
-> GIT can handle the version
-> He was on shift. We just went through his slide.