Meeting topics:

*Roman pots design discussion
    --Impedance calculations
    --vacuum constraints
*AOB

 

 

Recap from last week

  • Guna reached out to Alexei about neutron cone transition window (Alex was CC'd) --> still waiting to hear back.
  • Karim reached out to Gang about updates on impedance calculations.
    • Yulia: we need to invite Gang to give an update.
    • Yes, but the issue is availability of the computing resources. --> overall issue right now.

 

Karim on neutral cone/Roman pots interference

  • Still not fully quantified how much interference there is --> we can start identifying potential solutions.
  • Part of the issue is the HSR/IR finalization - still some work being finished here, which could affect our coverage downstream.
  • Guna will update the figure to get some hard numbers on the amount of interference.

 

Karim on Cabling and RF shielding

  • Bend radius of the cables on the RP PCBs? --> question to Jack, Alex already emailed Jack to discuss.
    • Different solutions requires different cable lengths and bend radii
  • RF shielding -- attach RF fingers to chimney or to the detector?
    • Having RF shield on the detector could create additional loss of acceptance --> trap door/brush seals/etc. on the chimney better option to not limit acceptance.
  • Default cooling option is the Peltier approach developed by IJCLab --> alternate options to be considered if impedance calculations indicate significantly higher amount of cooling required - TBD from Gang's calculations.
  • Issue of RF shielding on bottom edge of detector (toward beam) becomes an issue of acceptance at low-pT --> need to look at how much material will be needed for RF to then perform a simulation to assess impact on particle acceptance. (Alex needs to do this)
  • Chang: How often is the detector inserted/retracted in a given year? 100s of times per year.
    • This is a problem then for a "trap door" or something which has an additional moving part, another thing which can fail.
  • Raphael: For vacuum, do we need to pump on the chimneys themselves? Will there be a pump there?
    • Karim & Guna: there has not been a discussion about adding a dedicated pump here, but it's something that needs to be discussed. Is there even space for a pump?
    • Raphael: this is why the question is important - we need to really think about how we maintain vacuum in this region to reduce liability to the machine. Would be better to pump the chimneys, if possible.
    • Alex: UHV has new "screw pumps" which are quite compact - is there some option which can be space-saving and provide the needed vacuum?
    • Chang: What is the vacuum level?
      • vacuum level is ~ 1e-10 
  • Yulia to Wlodek: what was the grounding scheme for the STAR Roman pots? Where were the power supplies located? --> Need to discuss, Alex will follow-up.
There are minutes attached to this event. Show them.
    • 11:00 11:20
      Impedance calculation updates (if any) 20m
    • 11:20 11:40
      Roman pots and OMD scattering chamber updates 20m
      Speakers: Alexander Jentsch (Brookhaven National Laboratory), Karim Hamdi
    • 11:40 11:50
      Required simulations and work plan toward Fall review 10m
    • 11:50 12:00
      AOB 10m