***ATTENTION Indico Users***

Notice: LaTeX services are temporarily disabled and will be reintroduced in 3.3.12 which is currently being planned

Please see the News section for more information.

S&C Weekly

US/Eastern
Description

Link for this meeting is

https://bnl.zoomgov.com/j/1618203935?pwd=KlQMpF33b1yPN7ddLVgHpK52vjEWRn.1

    • 11:30 AM 11:45 AM
      Calibration and production status 15m
      • List item

      Calibrations and Productions:

      • Run 22 pp500 st_physics, st_mtd, st_upc completed done
      • ==> st_fwd awaits further progress on FWD software; consider processing a fraction (e.e. 10%) sooner?
      • ==> Zero field data (2022+2024) DEV test production completed at request of FWD group
      • > > Memory exceeded 4 GB for a single job, and re-running it succeeded
      • Runs 20 & 21 7p7 beam-beam and 26p5 FXT : P25iy calibration production ongoing
      • ==> Run 20 7p7 beam-beam may need TPC SpaceCharge calibration re-visit; will assess from the calibration production
      • ==> event.root produced for 7p7 beam-beam in case needed for TPC dE/dx
      • Run 23 AuAu200 needs EPD calibration finished (expected in a week or so)
      • ==> Also needs library freeze (SL26y) with memory management patches

      Libraries

      • SL16d_embed : immediacy of need stressed at last week's Analysis Meeting; I need to tag what I have and discuss vetting it with the parties of interest
      • SL26y and SL26a freezing still to-do; await one or two more FWD PRs
      • SL20c patch for embedding deuterons still to-do also
      Speaker: Gene Van Buren (BNL)
    • 11:45 AM 12:00 PM
      geant4star project status 15m
      Speaker: Dr Jason Webb (Brookhaven National Lab)
    • 12:00 PM 12:15 PM
      Forward tracking software update 15m
      Speaker: Akio Ogawa (BNL)
    • 12:15 PM 12:30 PM