SDCC Liaison Meeting
3-192
Bldg 510
Facility News & Announcements
Maintenance Intervention ETA is 8/20 for NFS cut-in, T-O-R switch transition, and re-IP RHIC nodes
AFS RHEV filesystem requires 15 min maintenance an announcement will follow
Network Operations
BNL cloud is retired
TOR switches have been dispatched by procurement arrival at BNL ETA is by August
Storage Group none
HPSS status
round powderhorn silos decommissioning is complete
began repacking DST class from LTO4 tape to LTO7 tape
STAR had exclusive permission to raw ‘18
PHENIX tape purchase was delivered to BNL
General Services
SSL settings will be tweaked on the mail server (this should be transparent)
STAR GPFS appliance arrived
home directories have been migrated to the new appliance
request for experiments to do NFS home directory load testing emails were sent out
RACF Linux Farm
RHIC cvmfs repos are in place
CSI resources
we observed excessive buffering on Infiniband swiches
this is an ongoing investigation with the support of their engineers
GPFS was down for approximately 2 hours during the initial troubleshooting
AOB
electricians will require a brief downtime to service PDU feeds in CDCE room for safety
announcement will follow with a possible rolling downtime schedule for week of 7/30