SDCC Liaison Meeting
3-192
Bldg 510
RACF/SDCC Network Operations
RHIC Migration,ATLAS DCache Migration – Status reports
Preparations for ToR migration – Intervention on Aug 21,2018
ToR switch and cable pre-deployment
Ipv4 layout
Power Interventions in CDCE – Jul 23 – Aug 3
Receptacle work begins on Aug 21
Retirement of the legacy BNL Cloud installation
New HPSS FC Infrastructure Deployment
USATLAS Web infrastructure move to SciZone
Summer/cleanup project – free space in CDCE
RHIC Central Storage
Grounding of racks (transparent)
Some issues with the grounding of metal clad receptacles
Shared Pool – Closing some parts
Maintenance – Star Grid, Phenix, GPFS, BlueArc down, NFS down
800 systems being re-iped
AFS work/maintenance needs to be done – RHIC and US Atlas AFS volumes needs to be salvaged.
See slides posted on agenda
Storage Group update
Server tests on latest version, tested on SL6/SL7.
Stable operations.
HPSS status
HPSS Operations are fine. STAR – 2018 data restricted Ordered LT04 tapes New TSM operational, backup done, will be updating to new system
General Services:
NFS appliance upgrade going on
BlueArc system migration to GPFS – Phenix filesystems being moved currently
Other home directories to GPFS were done( resolving some issues with STAR)
NoMachine – Testing upgrade of NX version 6, web-requisition put in for the NX license renewals.
RACF Linux Farm
RCF and USATLAS T3 computing facilities - Maintenance Aug 21st
RCF processor farm will be moved to new network equipment and re-IPed.
800 systems to be re-iped and rebooted.
NFS directories will be moved to new equipment.
New ToR switches – can accommodate only certain number of systems – so PHENIX will be losing 4 nodes and and STAR will be losing 5 nodes, so data needs to be backed up
New Address space
Shared Pool – Need to discuss with condor developer to work on time frame for jobs to run.
CSI Resources
Stable output
Order for new GPU m/cs went out
AOB
Requirement for CVMFS File System documentation