ePIC AC-LGAD TOF DSC Weekly Meeting Wednesday (10:30AM)

US/Eastern
https://zoom.us/j/94203887542?pwd=NERaQWRuaEdlQ0JaOFRiSm1DT09QUT09 (zoom link)

https://zoom.us/j/94203887542?pwd=NERaQWRuaEdlQ0JaOFRiSm1DT09QUT09

zoom link

Meeting ID: 942 0388 7542 Passcode: 467095
Zhangbu Xu (Kent State University), Satoshi Yano
    • 1
      news and updates

      from project CAM:

      Hi All,

      we were asked about where each detector is foreseen to be built.
      So I am asking you what are the plans regarding the construction of the barrel tof and the forward tof.
      Where do you think these detectors will be build? Are the staves build at some university and then sent
      to BNL to assembly into the Barrel TOF and the Forward TOF or are the barrel and foward tof assembled
      somewhere else and then shipped to BNL as a full detector?
      We have to provide the project with a plan and based on that plan request space and other resources
      need at BNL before installation into the ePIC detector.
      If this information is not readily known it needs to be addressed and discussed in the TOF meetings
      and come up with a proposal.

      Best regards,
      Beni

      Clean room space and grade
      cooling,
      engineer help

      Speaker: Zhangbu Xu (Kent State University)
    • 2
      eRD annual review report updates?
      Speaker: Alexander Jentsch (Brookhaven National Laboratory)
    • 3
      ePIC Collaboration meeting AC-LGAD workfest agenda

      (1) Introduction (10’) Zhangbu Xu
      (2) Barrel TOF (15’) Satoshi Yano
      (3) Forward TOF (15’)
      (4) FF AC-LGAD detectors (25’) Alex Jentsch
      (5) Luminosity tracker (15’)
      (6) eRD112 (25’)

      COFFEE (30’)

      (7) FCFD (15’) Zhenyu Ye
      (8) EICROC (15’)
      (9) Electronics (20’) Wei Li
      (10) Support structure & PCB & Cooling (20) Oskar Hartbrich
      (11) Digitization (15’) Prithwish Tribedy
      (12) Discussion (20’) ALL

    • 4
      HPK vs BNL sensors
      Speaker: Shirsendu Nanda (UIC)
    • 5
      material budget in simulation and impact on BEMC?

      Dear All,

      I promised some time ago to sent the information how material impacts the performance of an ECal depending on the distance and its density which has been done some time ago.

      I hope the info is helpful
      Cheers elke