Choose timezone
Your profile timezone:
BIC general meeting minutes
2/14/25
See slides for details.
ePIC mtg update:
-Wouter: post slides 12 hours before
-Norbert: caloroc availability clarification, final final version not available until 2028
Manoj update:
-Jessica: are there any other known issues for AstroLinx? No
-Sasha: Has the power consumption changed? It went up to the nominal target of 2 mW/cm^2
Zisis update:
-need to iterate on the cooling, especially for AstroPix operation temperature
-noted that the sticky optical interfaces can easily collect dirt—that’s why assembly is done in a cleanroom