AC-LGAD working group meeting
Meeting for all AC-LGAD subsystems to discuss topics of common interest (e.g. sensors, ASICs, testbeams).
This meeting will use the TOF Zoom link: https://bnl.zoomgov.com/j/1617546118?pwd=qNzxLqF8Q4Mj3RerAZdVSELzEgEQzV.1
General agenda:
1) Short updates from institutions on AC-LGAD efforts
2) Discussion of plan/goals for potential SPS testbeam et al.
3) Question which need to be addressed before a new sensor production can be ordered.
Attendees: Alex, Satoshi, Ashik, Elke, Grigory, Jennifer, John, Masashi, Mathieu, Olga, Prithwish, Takashi, Taku, Tommy, Yu, Zhangbu, Beni, Gabriele, Dominique, Kentaro
Update on SPS testbeam: RE47 (our activity number) has a week in the "draft" schedule in mid-July, but I have NOT received any official email from them confirming this, so it is still in "draft" form on the schedule. I have already reached out to Martin for an update.
Satoshi's Update:
- DESY testbeam analysis updates
- 2 digitizers -> 3 LGADs to use for timing reference.
- Data successfully calibrated and initial amplitudes look reasonable for each channel.
- Position reconstruction data shows anomalous behavior near strip for two different reconstruction methods --> still under study.
- Hit position correlation between sensors (with first sensor as reference) shows some deviation from slight misalignment of DUTs.
- Timing difference data between hits in different seniors show very strange two-band structure - needs further study to understand.
- KEK testbeam (parasitic) just started with pixel sensors (20um and 30um) and strips (50um) - 6 GeV beam. (now until February. 25th)
- Tohoku-RARiS, electrons at 800 MeV happening March 3rd to 6th -- goal is to look at other strip sensors geometries and follow-up on questions from previous campaigns.
- "plan B" sensors. --> looking at shorter strips with larger pitch, degrade position resolution in favor of timing resolution, since the latter drives the TOF requirement.
- KEK 6.5 GeV (main) beam planned for late Fall (Oct. to Dec.) with a primary goal of testing full chain with strips + FCFDv1.2
- Elke: Question to "plan B" sensors --> what about impact on FCFD design if this route needs to be pursued? --> Would require re-design of FCFD analog front-end, so this option needs much more discussion. --> Goal now is just to study the different sensor and see what is gained with other option. --> different length contributes to different capacitance, and may also reduce active area.
- Beni: Half strip length with "plan B" means double the # of channels? --> No, pitch is increased, so it cancels out.
- Zhangbu: do we have any study of dead area as a function of different pitch? --> not at the moment.
Taku's Update:
- Focus on updates on investment from Japanese funds (see slides for detailed breakdown).
- Sensor productions, lab equipment (bonding, clean room, digitizers, etc.).
Dominique's update:
- EICROC1 received at OMEGA, and initial testing work is underway.
- IR laser data analysis underway at IJCLab.
- Experiencing issues with new firmware for EICROC0.
Grigory's update:
- UIC can characterize sensors, perform TCT, etc. --> participated in previous testbeam campaigns.
- Will be important as we receive new productions in the future.
- Have cold blocks for cooling DUTs --> can be used in testbeam to provide stable temps for DUTs.
- UIC wants to be involved in helping with databasing for sensors --> Simone already has a table, but maintainence will be important given the number of sensors we have on-hand, and how many will come in the future.
- A storage spot has been put together at BNL on GPFS02 to help with storage of teatbeam data.
- We will need to look at how to manage this longterm as we don't have unlimited storage (~10TB per campaign).
Jenni's update:
- Contributions aimed at TOF, with a focus on fTOF.
- Question about hybridization and QA --> all done at Oak Ridge? Would be good to have multiple locations.
- Jenni: have IR laser, probe station, analyzer, and small clean room. --> could have a setup at Hawaii to provide additional QA and testing for production.
- Mathieu: ASIC probing can be done at Oak Ridge, equipment exists already.
- Alex: Bump-bonding planned at ORNL, or at a vendor. --> Vendor.
BNL updates:
- Alex --> updates on EICROC0 + AC-LGAD testing. --> no questions
- Prithwish --> updates on RBv1 setup and power board.
- 3 power boards made, 2 tested.
- RBv1 setup is up at BNL, waiting FPGA programming from Tonko, but the components are ready.
- Mathieu: Why not use a FELIX? --> not ready yet, the current card is a light version of this.
- Gabriele Giacomini --> AC-LGAD productions at BNL
- Some wafers almost ready - just needs passivation layer. --> 4x4 sensors, and some strip production (already being distributed).
- Elke: BNL setup was used to check various things we couldn't do at HPK. --> addressing double-metal, and different technologies, pure AC-LGAD vs. some other approaches (implant embedded in resistive layer to reduce cross-talk). --> Some summary update is needed to come to closure point on R&D.
- Elke: any news from Taiwan? --> need to meet to finalize process, and then prepare first batch for production --> no timeline yet.
LBL updates from Yu Hu:
- update on JLAB testbeam results.
- Elke: This poor timing resolution is due to the incorrect bias voltage? --> Yes, and the DESY result already show a larger signal amplitude, so we will likely see better timing resolution from that campaign to confirm.