ePIC AC-LGAD TOF DSC Weekly Meeting

US/Eastern
https://bnl.zoomgov.com/j/1617546118?pwd=qNzxLqF8Q4Mj3RerAZdVSELzEgEQzV.1 (zoom link)

https://bnl.zoomgov.com/j/1617546118?pwd=qNzxLqF8Q4Mj3RerAZdVSELzEgEQzV.1

zoom link

Zhangbu Xu (Kent State University), Satoshi Yano
Description

eic-projdet-tofpid-l@lists.bnl.gov

zoom link : https://bnl.zoomgov.com/j/1617546118?pwd=qNzxLqF8Q4Mj3RerAZdVSELzEgEQzV.1

    • 1
      TOF Preliminary Design Review (June 3-4)

      From: Surabhi Tarafdar stara@jlab.org
      Sent: Wednesday, April 1, 2026 5:14:13 PM (UTC-05:00) Eastern Time (US & Canada)
      Subject: Re: TOF Preliminary Design Review

      Dear TOF DSL and DSTCs,

      The agenda for TOF PDR (60% design completion) has been finalized and will take place on June 3 and June 4 , 2026. The charge questions for the reviewers and the agenda is below

      Charge questions :
      1. Are the technical performance requirements appropriately defined and complete for this stage of the project?
      2. Are the plans for the various sub-systems appropriately documented and complete for this stage of the project?
      3. Are the current plans for the detector likely to achieve the technical performance requirements, with a low risk for cost increases, schedule delays, and technical problems?
      4. Are the schedule assumptions for the fabrication of the various sub-systems and assembly plans reasonable and consistent with the overall detector schedule?
      5. Have ESH&Q and QA considerations been adequately incorporated into the plans at their present stage?
      6. Have the recommendations from previous reviews been adequately addressed?
      Schedule
      June 3, 2026
      08:00 (20 mins) Executive Session (Closed Session)
      08:20 (15+5 mins) Overview and Requirements –
      08:40 (20+10 mins) BTOF sensors
      09:10 (30+10 mins) BTOF modules
      09:50 (30+10 mins) BTOF integration
      10:30 break
      10:40 (20+10 mins) TOF ASICs
      11:10 Further questions
      11:30 Adjourn
      June 4, 2026
      08:00 (20+10 mins) FTOF sensors
      08:30 (30+10 mins) FTOF modules
      09:10 (20+10 mins) FTOF integration
      09:40 (20+10 mins) TOF Service Hybrid
      10:10 Further Questions
      10:30 break
      10:40 (Short) Executive Session
      11:30 Adjourn
      June xx, 2026
      9:00 (30 mins) Closeout

      Best regards,
      Surabhi

    • 2
      Beam Test at Jlab and DESY and Japan updates?

      KEK possible dates: 6/04, 05/28, 05/21

      NO test beam at FNAL

      Feb 19-25 at KEK, first week of March

      JLab testbeam results:
      https://drive.google.com/file/d/1O-Y1ByGy6GPxHMMKGyODMDPGZAW5nWI4/view
      test beam facilities:
      https://test-beam-facilities.web.cern.ch

      paper out on irradiated AC-LGADs from last year: https://arxiv.org/abs/2503.16658
      We did another round of irradiation with neutrons on some AC-LGADs but at extreme fluence, plus another irradiation campaign with protons on the large AC-LGADs that should be ready soonish.
      SEB studies from BNL: https://indico.global/event/14966/contributions/133281/attachments/63257/122069/SEB_CPAD_2025.pdf

      Cheers,
      Simone

    • 3
      FTOF hit occupancy?
    • 4
      NIMA special issue: "The ePIC Detector and Science Program at the Electron Ion Collider"

      A shorter version of preTDR?

      On Mar 11, 2026, at 1:26 PM, Silvia Dalla Torre Silvia.DallaTorre@ts.infn.it wrote:

      Dear DSLs,

        the submission of papers to the NIMA special issue
      

      "The ePIC Detector and Science Program at the Electron Ion Collider"
      is opening on March 15th.

      The DSC contributions are expected to be a substantial component of the effort.
      Please, discuss the matter within your DSCs and prepare 1 slide that presents
      the paper-planning of your DSC. Send me these slides by April 10th.

      At the TIC meeting on April 20th we will analyze and comment together
      about the merging planning.

      Thank you for your kind collaboration,
      Silvia

    • 5
      BTOF clustering algorithm resolution
    • 6
      EICROC QA

      vendor or collaborators?

    • 7
      EICROC review

      https://indico.bnl.gov/event/32195/