Choose timezone
Your profile timezone:
Zoom: https://lbnl.zoom.us/j/94194541032
Password: PDG number of the proton
Ongoing tests on ITS3 FPC: Eye Diagrams and TDR
Orders placed (most items expected by end of June)
Surveying 16 GHz bandwidth oscilloscope for eye diagrams. Longer purchase procedure. Purchase expected in the second half of the year.
SVT IB prototypes A (for signal integrity testing) and B (for wire bonding tests) received from LTU
Master student dedicated to FPC testing has started his thesis a few weeks ago