Conveners
Commissioning
- Daniel Johnson (FNAL)
- Violeta Toma (TRIUMF)
After a 2-years shutdown period, in which extensive refurbishment and modernization measures were carried out (including civil construction work in preparation of the GSI connection to FAIR), the entire GSI accelerator chain was put back into operation for the research program of FAIR Phase 0. Additionally, the largest part of the accelerator facility should be controlled with the new FAIR...
ESS will start commissioning summer 2018. We present the process we follow in order to ensure a safe commissioning, including the license process, the Ready Review process, training of operators, and the creation of an Operations Team.
After the Long Shutdown 1 (LS1) a working group with the mandate to review the LHC injector re-commissioning strategy was created beginning of 2015. Now with 4 years experience restarting the Proton Synchrotron Complex machines, the team is preparing the restart after Long Shutdown 2 (LS2), which will take place during 2019-2020, hosting an extensive upgrade campaign for the LHC injectors....