- Indico style
- Indico style - inline minutes
- Indico style - numbered
- Indico style - numbered + minutes
- Indico Weeks View
Join ZoomGov Meeting
https://bnl.zoomgov.com/j/1618397692?pwd=Rm9zMmJxa1NNakpiMmN3K012ZndJUT09
Meeting ID: 161 839 7692
Passcode: 462040
One tap mobile
+16692545252,,1618397692#,,,,*462040# US (San Jose)
+16468287666,,1618397692#,,,,*462040# US (New York)
Dial by your location
+1 669 254 5252 US (San Jose)
+1 646 828 7666 US (New York)
+1 551 285 1373 US
+1 669 216 1590 US (San Jose)
Meeting ID: 161 839 7692
Passcode: 462040
Find your local number: https://bnl.zoomgov.com/u/alHADfMo1
Join by SIP
1618397692@sip.zoomgov.com
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 161 839 7692
Passcode: 462040
Wiki :
DAQ - EIC Project Detector Collaboration (bnl.gov)
Mailing list :
https://lists.bnl.gov/mailman/listinfo/eic-projdet-daq-l
https://lists.bnl.gov/mailman/admin/eic-projdet-daq-l
eic-projdet-daq-l@lists.bnl.gov
Mattermost : join det1-daq channel
https://eic.cloud.mattermost.com/signup_user_complete/?id=i8gnmob4stdrpjfrezhegxs3ew
Digitization table link
https://docs.google.com/spreadsheets/d/1s8oXj36SqIh7TJeHFH89gQ_ayU1_SVEpWQNkx6sETKs/edit?usp=sharing
Project information link
https://wiki.bnl.gov/EPIC/index.php?title=Project_Information
Cables and service spreadsheets subdetectors
The overall goal is to develop the timing protocol for the ePIC Data Acquisition system towards the coming PDR and TDR.
William Gu presented on the proposed timing protocol and hardware implementation for synchronizing data between the GTU, DAM, and RDO. This generated discussion around several topics including:
- Clock synchronization and recovery: Methods for recovering clocks after resets using a pseudo clock scheme were discussed. Testing phase locking and stability over resets is an action item.
- Link specifications: The group debated specifications like data content, latency, and data rates for links between components.
- Synchronization protocols: Options for heartbeat-style signals to coordinate data transfer between units were discussed.
- Overflow management: Challenges of designing backpressure mechanisms to handle buffer overflows across the distributed system were discussed.
- Whether to align timeframe with EIC beam orbit: Not aligning the time frame with orbit could help avoid biases in the off-line analysis, e.g. for pattern recognition correlation to bunch position/spin state.
It was agreed more focused work is needed to finalize the timing system specifications. Targeted WG meetings or a small group work-fest were proposed to finalize the design.