-FPCs under manufacturing, ready in about 2 weeks.
-STFC issued PO.
-Admistrative document to be signed by STFC/UKRI.
-About spTAB: baseline for smaller pitch (suitable for pwr track connections) is 140um pitch: 70um track + 70um gap
4
Prototyping: IB FPC
5
Further brainstorming
Speakers:
Marcello Borri(staff@stfc.ac.uk), Sergio Rescia(BNL), Todd Huffman(member@ox.ac.uk;staff@ox.ac.uk), William Helsby(staff@stfc.ac.uk), Xuan Li(Los Alamos National Laboratory), Zhenyu Ye(Lawrence Berkeley National Laboratory)