ePIC SVT WP3 Electrical Interfaces Meeting

US/Eastern
    • 1
      Introduction
      Speakers: Marcello Borri (staff@stfc.ac.uk), Zhenyu Ye (Lawrence Berkeley National Laboratory)

      -Appointment of co-convener: Dr. Zhenyu Ye;

      -Extension of WP3 meetings to 2025: every month on the 2nd Thursday; OK? OK, agreed, no issues raised at the meeting.

      -Extension of WP3 meetings to 2025: current time 10am ET, to move to 11:00 -11:30 am ET to allow for a softer start in the US west coats (08:00 - 08:30 am PST). OK? OK, agreed 10 am ET, no issues raised at the meeting.

       

    • 2
      Prototyping: Disk FPC
      Speakers: Xuan Li (Los Alamos National Laboratory), Zhenyu Ye (Lawrence Berkeley National Laboratory)

      -Desirable: to prepare a presentation for next time to share the strategy to develop Al FPCs with Omni.

    • 3
      Prototyping: OB FPC
      Speakers: Andrew Hill (staff@stfc.ac.uk), Ihor Tymchuk (RPE LTU), Joellen Renck (Los Alamos National Laboratory), Marcello Borri (staff@stfc.ac.uk), Todd Huffman (member@ox.ac.uk;staff@ox.ac.uk), William Helsby (staff@stfc.ac.uk)

      -Inspection of low TRL OB FPC protypes at DL; OK, Sanity checks : visual insepction of FPCs looks good, spTABs align with pads on interface PCBs as expected;

      -Status on interconnection of low TRL OB FPC protypes in UK: Wedge for spTAB ordered, estimated delivery 11/12/2024;

      -Updates from LANL; To check the impedance of differential tracks with Q-Flex; May need to order a different prototype with impedance matched tracks;

      -RPE LTU update on daisy chain structures to compare spTAB with wire bonding; RPE LTU to provide proposal in the next weeks;

    • 4
      Prototyping: IB FPC
      Speakers: Andrew Hill (staff@stfc.ac.uk), Laura Gonella (INFN Trieste)

      -Definition of the features to put on mechanical dummy FPC to be used for intital IB assemblies; OK to make an FPC mock up for LEC of wafer scale sensor; OK to replicate material budget from ITS3 as initial configuration; OK to put wire bonding pads/areas in the side of the FPC facing the wafer scale sensor; OK to add pads the back end of the FPC to test continuity;

      -Discussion on tests to do with low TRL OB FPCs in Trieste; Discussed electrical tests of FPCs in curves configuration; Effort from Triest availalbe from Jan 2025; Trieste happy to spTAB m-FPC to interface FPC at their site;

    • 5
      Further brainstorming

      -OB module desing progressing: ported ALPIDE-like tooling into CAD, working on definiton of potential future flat configuration for module.