      Beam Test at Jlab and DESY and Japan updates?

      Feb 19-25 at KEK, first week of March

      JLab testbeam results:
      https://drive.google.com/file/d/1O-Y1ByGy6GPxHMMKGyODMDPGZAW5nWI4/view

    • 2
      scheduled discussions on action item tracker and Al-LGAD Working group (February 12,19)

      Dear TOF consortium ,

      We should meet to discuss about the progress on TOF action tracker

      https://www.dropbox.com/scl/fi/y3jj66yax7c05rtf2g258/TOF_Schedule_activities_v1.xlsx?rlkey=7532tcaf8f1z69h4wp37nbtfq&st=j133n88y&dl=0

      I am planning to call for meeting on Wednesday of February 11, 2026 @ 10:30 AM (EST) which was usually the time for TOF general meeting. Unfortunately, there has not been any entry in the progress section of the action tracker. We need to touch base on progress on the following action items

      BTOF :

      Procure in kind actual size strip sensor
      Finalize transmission line pitch of FPC
      Sample production of FPC
      Correct glue identification and test
      Glue curing instrumentation and test
      Design and test version 1 gluing jigs

      Following items on BTOF needs more coordination from Purdue so @Jung, Andreas and @Mazza Simone please get in touch with each other soon and plan how to progress along with the timelines for the same (hopefully this can be done before April PDR for TOF)

      Assemble stavelet mockup with Si heaters and cooling pipe
      Test mockup for thermal stress

      FTOF :

      ASIC and sensor heaters construction
      Assemble second module based on module V1 with heaters
      Thermal testing on module v2

      @Benoit, Mathieu all the listed activities has start date of on or after 10/30/2025. I suppose activities before that dates are finished so please update the action tracker with the appropriate "Status"

      Pixel Sensors :

      Population of "etched" assembly for IJCLab testing
      Testing (TCT and Sr-90) of etched assembly

      I will send out the zoom invite soon.