PID Review Final Talks
-
- 1
-
2
Welcome & IntroductionSpeakers: Dr E. C. Aschenauer (BNL), Rolf Ent (Jefferson Lab)
-
3
Particle Identification Systems Overview and RequirementsSpeaker: Benedikt Zihlmann (employee@jlab.org;member@jlab.org)
-
4
Detector Integration Status and CAD DesignSpeaker: Alex Eslinger (employee@jlab.org;member@jlab.org)
-
5
Flow of Requirements, Interfaces and system engineeringSpeaker: Walt Akers (Thomas Jefferson National Accelerator Facility`)
-
09:00
Break
-
6
Backward Region: proximity-focusing RICH
Each detector talk addressees: requirements (see eic.jlab.org), interfaces, tech. Details, status of R&D w.r.t. milestones and current project R&D plans, open points, plans for construction, 1 slide on ES&H/QA plans and hazards, current simulation performance vs. requirements, organizational structure of work packages for sub-systems and schedule/timeline w.r.t. P6. Include reference to charge that is addressed in each slide and in the outline.
Speaker: Alexander Kiselev (BNL) -
7
Barrel Region: high-performance DIRC
Each detector talk addressees: requirements (see eic.jlab.org), interfaces, tech. Details, status of R&D w.r.t. milestones and current project R&D plans, open points, plans for construction, 1 slide on ES&H/QA plans and hazards, current simulation performance vs. requirements, organizational structure of work packages for sub-systems and schedule/timeline w.r.t. P6. Include reference to charge that is addressed in each slide and in the outline.
Speaker: Grzegorz Kalicy (CUA) -
8
Forward Region: dual RICH
Each detector talk addressees: requirements (see eic.jlab.org), interfaces, tech. Details, status of R&D w.r.t. milestones and current project R&D plans, open points, plans for construction, 1 slide on ES&H/QA plans and hazards, current simulation performance vs. requirements, organizational structure of work packages for sub-systems and schedule/timeline w.r.t. P6. Include reference to charge that is addressed in each slide and in the outline.
Speaker: Marco Contalbrigo (INFN Ferrara) -
10:40
Break
-
9
Barrel and Forward TOF: AC-LGAD
Each detector talk addressees: requirements (see eic.jlab.org), interfaces, tech. Details, status of R&D w.r.t. milestones and current project R&D plans, open points, plans for construction, 1 slide on ES&H/QA plans and hazards, current simulation performance vs. requirements, organizational structure of work packages for sub-systems and schedule/timeline w.r.t. P6. Include reference to charge that is addressed in each slide and in the outline.
Speaker: Zhenyu Ye (University of Illinois at Chicago) -
10
AC-LGAD readout systems
requirements of ASCI, milestones and current project R&D plans and expected future work
Speakers: Dominique MARCHAND (employee@cnrs.fr), Tonko Ljubicic (BNL) -
11
Readout and Sensors Status SiPMs
requirements for sensor, operation and readout, technical solutions, milestones and current project R&D plans and expected future work
Speakers: Marco Contalbrigo (INFN Ferrara), Roberto Preghenella (INFN Bologna) -
12
Readout and Sensors Status LAPPD/HRPPD
requirements for sensor, operation and readout, technical solutions, milestones and current project R&D plans and expected future work
Speaker: Alexander Kiselev (BNL) -
13
DAQ streaming readout OverviewSpeaker: David Abbott (Jefferson Lab)