The fourth in-person workshop for the ePIC Barrel Imaging Calorimeter is aimed towards completing our PED milestones and preparing for the Preliminary Design Review expected in August 2025. Registration is now open (see sidebar).
Note that you need to register separately for Argonne site access. Please fill out the following form by March 26th to ensure smooth processing: Badge Site Access Registration Form.
Overview of how BIC is implemented in the Simulations, Digitized and Reconstructed
Update of the implementation of the digitization and reconstruction (SiPM and HGCROC)
Design and technical solutions for the test articles that will be used for the system testing (dimensions, goals of measurements, modularity): Quint board, Baby BCAL box, test article box
Test article requirements: what is needed for the test articles, readout modularity.
Baby BCAL SiPM Board with Box (LEGO approach, HGCROC and amplifiers modularity, summing/non summing, mechanics, cooling?)
Quint Board: same questions + the size
Final Test Article for Lanky BCAL: what capabilities do we want to show within the ESB.
Discussion Topics:
- Test articles
- Module-tray integration
- Module locking system
- Envelope
- Overlap between staves
- ETC mounting strategy
- Cooling/AstroPix power
- Installation strategy and tooling
- Module overlap and flex design
http://skeletonkeybrewery.com/
->we can order pizza if people want food
R&D/Testing Goals
High-level Accomplishments
Focus on AstroPix-SciFi Integration and Bench Tests
The Beam Test Results will be covered in the next talk
How the reviewer comments have been adressed?
What was the goal of the beam test?
What have you learned?
What are the things still to be accomplished
Energy calibration procedure
QC test at wafer level, Module level, stave level, system level
Parallelizing the QC setups