Annual NASA Review - FY24
Bldg. 911B, LCR
Brookhaven National Laboratory
-
-
Convene in LCR, Bldg. 911B: NASA Annual Review
- 1
-
2
NSRL Operations
o Staffing / List of personnel directly supporting CAD operations
Identify who can run beam solo and how long are they in training
Include names/orgs of cross trained individuals
Discuss future hiring/cross training plans
o NASA hours run in 2024
o Non-NASA users’ activity: hours and revenue.
Details on MDA and TRMCSpeaker: Michael Sivertz (BNL) -
3
NSRL Upgrades
o Maintenance and Upgrade Costs for 2025
o Impact of EBIS performance due to additional Tandem hours required
o LION-2 installation status / commissioning
o R-line power supply upgrades / installation schedule
o RFQ pulsed power amplifier cost and schedule (from Masahiro Okamura)
o AC for animal rooms
o D6 heat sink replacement
o Access Controls (for Jonathan Reich)
o Status – GCRSim Cut Off Chamber
o Status – 1024 pixel chamber
o Status – NSRL Development and Test Station
o Trailer Corridor/Walkway cost estimate
o Unfilled orders, procurement status, timing, contract close out/invoicingSpeaker: Michael Sivertz (BNL) -
4
NSRL Future Guides
o Provide technical plan and schedule to get protons from EBIS. Identify cost-sharing opportunities with other BNL programs.
o Update based on September 2024 test demonstration of protons from EBIS
o Parallel ion source for protons from EBIS (for Masahiro Okamura)
o Booster Maintenance Schedule and Shutdown
o RHIC Shutdown
o EIC Construction and its impact
o Other maintenance and upgrade plansSpeaker: Michael Sivertz (BNL) -
5
Bio-Medical Operations
o Staffing / List of personnel directly supporting Biology operations
o Maintenance or upgrade requirements – (technical cost schedule)
o SACRR update
o Summer School Summary (SHINE)Speaker: Peter Guida (BNL)
-
12:30
Lunch
-
Convene in LCR, Bldg. 911B: NASA Annual Review
- 6
-
7
Open Actions
-