Forward STAR upgrade face-to-face
Meeting URL
https://bluejeans.com/728764125?src=join_info
Meeting ID
728 764 125
Want to dial in from a phone?
Dial one of the following numbers:
+1.408.419.1715 (United States(San Jose))
+1.408.915.6290 (United States(San Jose))
(see all numbers - https://www.bluejeans.com/premium-numbers)
Enter the meeting ID and passcode followed by #
Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
-
-
1
FST Prototype Assembly and TestSpeaker: Xu Sun (University of Illinois at Chicago)
- 2
- 3
-
4
Hybrid and T-board production and assemblySpeaker: Maowu Nie (Shandong University)
-
5
FST Mechanical StructurSpeaker: Yi Yang (NCKU)
-
6
FST Timeline, Milestones and ResourcesSpeaker: flemming videbaek (BNL)
-
12:45
Lunch Break (on your own)
-
7
Update on Tracking SoftwareSpeaker: Daniel Brandenburg (Brookhaven National Laboratory)
- 8
- 9
-
1
-
-
10
sTGC Module design, production and testSpeakers: Qian Yang (Shandong University), Yingying Shi
-
11
sTGC Electronics statusSpeaker: Feng Li
- 12
-
13
sTGC Safety and CommissioningSpeaker: Prashanth Shanmuganathan (Brookhaven National Lab)
- 14
-
11:45
Lunch Break (on your own)
- 15
-
16
FEE board status, MDR cables, MPODSpeaker: Mr Gerard Visser (Indiana University)
-
17
patchpanel, other cables, LED systemSpeaker: tim camarda
- 18
-
19
Z-dependent light collection efficiency and update in HCal calibrationSpeaker: Navagyan Ghimire (Temple University)
-
Discussion of a plan to install hardware at STAR
-
20
schedule and task list for infrastructureSpeaker: Rahul Sharma (BNL)
- 21
-
20
-
Commissioning plan
Commissioning plan (partially covered in 2), but as you listed software separately - we'll need to hear current status of software we'll need for commissioning.
The goals are:
a) identify missing components
b) identify person(s) who will be able to continue to do most of lifting during next couple of years as well.
Commissioning will continue through Run21/22 and being involved in this from the beginning is very important.-
22
Commissioning Software update of what we already have and what is missingSpeakers: Akio Ogawa (BNL), David Kapukchyan (University of California Riverside)
-
23
Slowcontrol StatusSpeaker: Paul Nord (Valparaiso University)
-
22
-
10